Component storage profile
Record components, packaging, serial numbers, value and storage conditions. Electronics may need ESD protection and humidity control; heavy parts affect racking and floor loads. Distinguish available, blocked and inspection stock in both the layout and inventory system.
Assembly and manufacturing
A machinery and workstation plan identifies floor area, power, compressed air, ventilation and testing zones. Include personnel routes, material supply, rework and expansion. Existing utilities, load capacity and permitted building use must be verified for the specific premises.
Receiving and dispatch
Connect receiving checks, document review and status release with the physical goods. Packaging and transport should prevent corrosion, damage and mix-ups. Clear identification links project components to orders, drawing revisions and recipients.
Prepare the Cheb operation
Coordinate shifts, delivery windows, maintenance and ramp-up volumes. Special goods need additional suitability and authorisation checks. The defence industry label alone does not determine what may be stored or processed in a building.
Prepare for site planning
The planning lists below are practical recommendations for your site project; they do not replace project-specific qualification or a regulatory decision.
- Record products, weights and storage conditions
- Plan storage, assembly and testing zones
- Verify floor loads and utilities
- Trace serial numbers and stock status
- Confirm permitted use before start-up